How to measure and reduce scrap in production

5 min read

Unmeasured scrap comes straight out of profit. Most businesses know there is "some" scrap, but not how much, or in which product, on which machine or in which shift it rises. The first step to reducing scrap is measuring it.

Separate process waste from rejects

Process waste is the natural loss of a process: cutting offcuts, material used during set-up, evaporation. Rejects are products that can no longer be used: out-of-tolerance parts, faulty seams, the wrong colour.

Track them separately. Process waste usually falls through design and method, rejects through quality and discipline.

First define the expected scrap

Every product has, or can be given, an acceptable scrap rate. Write that rate into the bill of materials. Material requirements are then calculated correctly, and you have a benchmark to compare actual scrap against.

Record the actual where the work is done

Scrap should be recorded when the work order is closed, not estimated at month end. If the record carries product, work centre, shift and operator, you can later find where the problem is.

A simple calculation is enough:

  • Scrap rate (%) = Scrap quantity ÷ Total material used × 100
  • Variance = Actual scrap rate − Expected rate in the BOM

Chase the variance

The gap between expected and actual tells you where to look:

  • High for one product: review the BOM, cutting plan or method.
  • High on one machine: check set-up, maintenance or tool wear.
  • High in one shift or for one operator: look at training and work instructions.
  • High with one supplier's material: tighten goods-receipt inspection.

Practical ways to reduce scrap

  • Cutting optimisation: a cutting plan with the least offcut from sheet, roll or bar.
  • First-piece inspection and sample measurement: make sure the set-up is right before series production.
  • Quality control at goods receipt: faulty raw material turns into multiplied scrap in production.
  • Regular maintenance: a machine that drifts out of adjustment increases both waste and rejects.

A business that starts measuring scrap sees within the first few months where it is losing money. When the expected rate in the BOM sits next to the actual rate recorded on the work order, the discussion moves from "there is too much scrap" to a specific product, machine or shift.